FACILITIES |
|
|
|
| |
|
|
| |
Plant Size Information |
|
| |
- Plant 1 - Plot 8000 sq.ft. & built up 5000 sq.
ft.
- Plant 2 - Plot 11000 sq. ft. & built up 8000
sq. ft.
- Open Plot - Proposed plant 3 - 22000 sq. ft.
|
|
| |
DESIGN SOFTWARE
Generally for designing and Drafting we are
having version of Autocad, MS Project packages, Design
CAD 3D Max. Plus.
|
|
| |
|
|
| |
|
|
| |
LIST
OF MACHINERY INSTALLED |
|
| |
|
|
| |
| S.No. |
NAME |
QTY. |
MAKE
|
CAPACITY |
| 1 |
Plate Bending m/c |
1 No. |
LLOYDS |
20 Thk X 2500mm wide |
| 2 |
Plasma cutting m/c |
1 No. |
AIR PLASMA |
upto 30mm Thk in SS. |
| 3 |
Welding
Rectifier |
6 Nos. |
MEMCO |
400 AMPS. |
| 4 |
MIG/MAG Welding |
5 Nos. |
KEMPPI OF FINLAND
|
KEMPOMIG 3200 |
| 5 |
Tig welding m/c |
2 Nos. |
MEMCO |
- |
| 6 |
CO2 Welding m/c. |
2 Nos. |
MEMCO |
- |
| 7 |
Power Hacksaw m/c
|
1 No. |
JASWANT |
- |
| 8 |
Radial Drill m/c |
2 Nos. |
VIJAY |
38 mm dia. |
| 9 |
Magnetic drill m/c |
1 No. |
KBD |
32 mm dia. |
| 10 |
Air compressor |
2 Nos. |
Elgi |
- |
| 11 |
PUG Gas Cutting |
2 Nos. |
I0L |
- |
| 12 |
Optical Tracing Profile
cutter |
1 No. |
- |
- |
| 13 |
Lathe Machine |
1 No. |
- |
- |
| 14 |
Horizontal Boring
Machine |
1 No. |
- |
80 mm Spindle dia
WMW |
| 14 |
HANDLING
FACILITIES |
| a) |
EOT crane |
1 No. |
Local |
SWL=5T |
| b) |
EOT Crane |
1 No. |
- |
SWL = 10 T |
| c) |
Chain pulley block
|
1 No. |
Local |
SWL=5T |
| d) |
Chain pulley block
|
1 No. |
Local |
SWL=1T |
| e) |
EOT Crane |
2 No. |
Local |
SWl=2T |
| 15 |
HAND
TOOLS |
| a) |
Bench grinder |
1 No. |
ELMAK |
- |
| b) |
Electric hand Grinder
|
6 Nos. |
KBD/WOLF |
- |
| c) |
Elect. Sander |
2 Nos. |
- |
- |
| d) |
Jigsaw Machine |
1 No. |
- |
- |
| 16 |
ELECTRODE
DRYING OVEN |
| a) |
Drying oven |
1 No. |
|
|
| b) |
Holding oven |
1 No. |
|
|
| c) |
Portable Holding |
2 Nos. |
|
|
| 17 |
Shot Blasting Machine |
|
|
2.5 x 2.5 x 3M Job |
| 18 |
Hydro test pump. |
1 No. |
|
|
|
|
| |
|
|
| |
ALL WELDING MACHINES
AND MEASURING INSTRUMENTS ARE CALIBRATED. |
|
| |
|
|
| |
|
|
| |
TESTING
FACILITIES |
|
| |
|
|
| |
|
|
| |
|
|
| |
| TESTING FACILITIES
HIRED |
 |
All Physical, Chemical, IGC test
facilities are hired from m/s. Elca quality Systems
(Pune + Thane), m/s. Heat Fabs. - Which are approved
by various third party insp. Agencies as well
as govt.
|
 |
UT &
MPI are hired from any approved parties. |
|
|
| |
|
|
| |
|
|
| |
List of Calibrated
Instruments: |
|
| |
|
|
| |
| PRODUCT |
MAKE |
DESCRIPTION |
QTY |
YEAR |
| VERNIER
CALIPER |
FORBES
GOKAK LTD. |
0 -150 mm
0-300 mm |
01
01 |
2005 |
| OUTSIDE MICROMETER |
FORBES GOKAK LTD. |
0-25 mm |
01 |
2005 |
| MEASURING
TAPE |
FREEMANS |
3m, 5m,
15m |
25 |
|
| PRESSURE GAUGES |
WIKA |
0 - 10 Kg/ Cm2 |
03 |
|
| Height Gauge |
FORBES GOKAK LTD. |
0 - 600 mm |
01 |
2006 |
| Spirit Level |
KRISTEEL |
|
01 |
|
| Thread Plug Gauges
|
|
|
|
|
| Vernier Caliper |
Yamayo |
0 - 600 |
01 |
2006 |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|